HOUSATONIC RESIDENTS FOR CLEAN WATER
  • HOME
  • DOCUMENTS
    • Posters
    • Documents
    • Correspondence
    • Comments
    • Funding Options
    • Press Releases
    • The Plan
  • Resources
  • Events
  • About Us / Donate
  • CONTACT / Sign Up

The Main Advantages of Voting “YES

4/14/2025

0 Comments

 
Picture
The Main Advantages of Voting “YES” on acquiring Great Barrington Fire District and Housatonic Water Works Company (Housatonic Water below)

1) Provide structure and legal vehicle for Town’s strategic planning and operational guidance for its water resources
2) Maintain identification of its two water divisions (Great Barrington and Housatonic) for revenue and cost attribution
3)  Create the operational vehicle as a water enterprise fund and all its advantages
4)  Add a planning vehicle and an oversight board of water commissioners enhanced by a financial planning arm to restructure costs and financing for both divisions

Additional Advantages

Housatonic Water would gain  
  • Access to DWSRF* low-cost loans and government grants
  • Lower water usage charges than DPU’s approved settlement rates
  • Separate capital expense charges that reflect project plans with most favorable financing* 
  • Management oversight of timely project implementation
  • Financial transparency

Great Barrington Fire District customers would gain the same under the enterprise fund umbrella. In addition: 
  • Would be elevated from its historical anomaly to a true town resource
  • Incorporate transparency and oversight, parallel with Housatonic Water’s
  • Would have clear billing practices separate from real estate tax bills
  • Could include its board as Great Barrington's first town-wide water commissioners

Great Barrington would gain a way forward
  • Own its largest water resources, Long Pond 
  • Enjoy consistent, most favorable financing terms
  • Benefit from comprehensive planning, not fragmented interests
  • Guided by true town-wide “water commissioner board” with both long and short term oversight
 
*DWSRF=Drinking Water State Revolving Fund offers 0-2% interest and 20-40 year loans for the upgrade of aged water systems.
0 Comments

Great Barrington Fire District

4/13/2025

0 Comments

 
Picture
Letter to the Editor (local Berkshire news):  
GBFD’S MESSAGE IS INACCURATE AND MISPLACED
​

Great Barrington is one of the few MA towns that has not exercised statutory rights to acquire its independent water companies.  For the sake of sustaining our water supply, we need to change the lack of public governance.  That is the purpose of our two petitions that needs your vote on Thursday, April 17, at the 6 pm Special Town Meeting (STM).

Forming a water enterprise fund will ensure that only water users will pay for the acquisition, upgrades and usage costs for their own system.  NO ONE PAYS TWICE.  This is the principle of our wastewater facility.  Its expensive renovation was supported by grants, government loans, and the enterprise fund.

We can take a lesson from our neighbor, South Egremont, which re-acquired its water rights from the same Mercer family in 1996.  Wisely, the town had created an enterprise fund beforehand because that way, only 200 rate payers would be billed for these water system upgrades in a town of 1,000 people.  Businesses in town center knew how critical clean water was.

Regarding Egremont’s acquisition as reported in the Eagle, “…if the company declines the offer, voters…authorized the town to apply to the state Supreme Judicial Court to determine the appropriate price.”  This sure-fire provision is contained in Egremont’s State Statute and is identical to GB’s which we should use as a backstop.  Over 100 such statutes are documented in the DPU’s compendium of water statutes.

Funding for Egremont was accessed by grants; water users; and loans from the Drinking Water State Revolving Fund (DWSRF) at 0 to 2% rates and 20 to 40 year terms.  As an example, the State granted 50% or $2.4 million of Egremont’s pipe replacement costs for its Main Street renovation.  Contrary to idealists, the state does not guarantee loans until the Town owns the entity, so the Town must take these first steps.  

The projected expenses to upgrade GBFD’s system is on the same order as HWW’s.  GBFD received approval of $5 million for its capital plan at its Annual Meeting (with a quorum of 15 voters). In  HWW’s DPU settlement was approved for raising slightly less capital, but payback was shorter and interest rate higher (7%).   Long term, both require 40-year pipe replacement/repair plans as documented in the DPC Engineering report.  So there is no avoiding high costs for water system upgrades. 

To quote the GBFD’s fear-mongering letter that states: “If votes to purchase the Housatonic Water Company and the GBFD pass, customers of the Fire District and HWW and all taxpayers will be supporting twice the operating costs, along with the costs for infrastructure upgrades” is simply untrue.  Non-users of water systems (those on wells) will not be paying any water system costs, whether under the new or old GBFD or HWW.  

This year, GBFD levied $1.50 per $1,000 onto its users, that is 10% on top of our real estate taxes to support its $5 million capital plan without a peep from its water users.  That amounts to doubling the annual cost of water for most GBFD customers.  And, this is with or without an acquisition.    

If acquired, HWW users would actually pay less because it would be eligible for the low interest State Revolving Funds for water system upgrades.  In the DPU filing regarding the HWW rate settlement, Stockbridge calculated the DPU settlement rates would be reduced for the average rate payer by $660 annually if financed through a low interest, 20 year loan. 
 
These loans are not available to private water companies in MA according to U.S. Rep. Richard Neal.  GBFD was granted special privileges due to the State ensuring the early viability of its water system 100 years ago.   Many early water systems had failed. GBFD is still using these Town privileges for its tax billing and collection and has special access to DWSRF loans.  But this should not be confused with being under town governance. 

Prominent citizens have called for the abolition of GBFD for decades calling it “obsolete.”  In 2022, our Town could not convince GBFD to acquire or manage HWW because it was beyond GBFD’s power and financial charter.  To do so, GBFD must be acquired first by the Town, the reason for the second motion.

Excess overhead: We have two fire houses, but one fire chief, two libraries, but one library director.  It’s high time we leverage our precious water resources to plan, oversee and optimize our resources and costs. Our organizational fragmentation does not address a way to plan for our short or long-term water needs. 

For a start, please vote “Yes” on both motions on April 17. We need a 2/3 majority to send a message to our select board.
​
Sharon Gregory
Great Barrington

0 Comments

What if Housatonic Water Works’ Proposed Multimillion-Dollar Fix is Not Really a Fix?

11/17/2023

0 Comments

 
Letter to the editor by Andrew Berens, Housatonic, published in the Berkshire Eagle on Nov. 15, 2023.
Picture
Housatonic Water Works (HWW) has proposed a multimillion-dollar fix at the village’s expense for one aspect of the village’s water woes: turbid colored water. 

A HWW-commissioned study by Cornwell Engineering Group implicates elevated manganese levels as the genesis of this problem, and the company has a rate increase petition to pass these costs onto the citizens. ("Housatonic residents say they should not have to pay to fix the water. They asked regulators to scour company finances," Eagle, Sept. 27.) While the village is desperate for improvements in the water quality, I believe there are a number of discrepancies in the methodologies and conclusions of this report linking manganese levels and water color problems that warrant, at the very least, an objective, independently commissioned review by a third party. Understanding the true cause of the water woes might require a repeat study, especially given some of the concerns about data collection integrity and consistency, before implementing the proposed solutions to lower manganese levels at the village’s expense.


Read More
0 Comments

Housatonic Water Works is seeking a rate hike to cover system upgrades. Customers are urging DPU to reject it

9/24/2023

0 Comments

 
Picture
Banners last summer calling for Housatonic Water Works Co. customers to withhold payments over water quality issues were one form of protest over drinking water issues. Amid the company's request for a rate hike, residents are circulating a petition urging state regulators to reject allowing the increase in water bills. EAGLE FILE PHOTO
By Heather Bellow, The Berkshire Eagle
 
Sep 23, 2023
Banners last summer calling for Housatonic Water Works Co. customers to withhold payments over water quality issues were one form of protest over drinking water issues. Amid the company's request for a rate hike, residents are circulating a petition urging state regulators to reject allowing the increase in water bills.

Read More
0 Comments

9/26/23 Petition Comments for DPU Hearing Re HWW Rate Increase

9/10/2023

1 Comment

 
Picture
In addition to the signatures we are gathering with full contact information, the following comments have been submitted to date. Check back as more will be added. Your voice matters! Please click the button at left to sign the petition if you have not already done so.
View comments at https://www.housatoniccleanwater.com/comments.html
1 Comment

Email from Housatonic Resident to Great Barrington Board of Health

9/7/2023

1 Comment

 
Hello Michael [Lanoue],
Keeping the research straight  on DPU, DEP, and EPA sites is quite a challenge and I misspoke when I referred to a letter from DPU, when in fact it is DEP.  See: 
https://www.mass.gov/doc/2023-annual-notice-to-local-boards-of-health/download

Read More
1 Comment

Email from DPU Hearing Officer to Housatonic Resident - Criteria to Approve HWW Request for Rate Increase

9/1/2023

1 Comment

 
Dear Mr. and Mrs. Regan:
Thank you for your question.  I am not able to discuss the specifics of an ongoing investigation, but I can say that the Department is investigating the changes that Housatonic Water proposed to its rates and rules tariffs.  Also, I am able to discuss the Department’s process for this case.  For example, I can share that after receiving Housatonic Water’s petition, the Department issued a Notice of Filing, which described the petition and provided information about the process for public comments and intervention. The Attorney General has intervened on behalf of Housatonic Water’s customers.  No other party has filed a petition to intervene so far; the deadline for intervention is September 12th.  Also, the Department is in the process of reviewing the changes that Housatonic Water has proposed to its tariffs and issuing discovery on the Company’s proposals.

Read More
1 Comment

Phone Conversation with Housatonic Resident Kathy Regan and the DEP

8/31/2023

0 Comments

 
Saadi Motamedi, DEP, called back this morning. Very nice man. He took a lot of time without rushing. Following is what we covered.
  • He is going to try and track down an infrastructure map for us and will call back if he thinks of anything else he can do.
  • Saadi agreed with me that the residents are basically on our own unfortunately as no one really has direct oversight over Housatonic residents since HWW is a private corporation. He told me about a poor town whose sewer company is private and they closed down and now they literally have no where to flush to. 

Read More
0 Comments

Email to Berkshire Eagle from Housatonic Resident

8/30/2023

0 Comments

 
Hi Heather,
Thank you for the work that you have been doing covering Housatonic's water issues. We really appreciate it. 

One small thing I wanted to point out though. We only stopped paying our bill specifically because the town water is not meeting legal safety standards. We are very upset about the terrible water quality and service in general of course, but we only decided to stop paying when the legal safety standards were repeatedly breached and unresolved after so long. Being forced to pay for a "product" in the USA that does not meet legal safety standards that you cannot live without and cannot get elsewhere (a monopoly) is just wrong on every level. Once the HAA5 falls back down to what is considered legally safe (even though we may not personally agree with that level), we will start paying our bill once again, even if the other water issues continue. 

Read More
0 Comments

Email to Berkshire Regional Planning Commission

8/27/2023

0 Comments

 
Hi Tom,
I hope you are doing well. It's been many years, but you may remember meeting with me and Tom O'Brien when he was at the EOEA regarding LAPA-West, the Lakes and Ponds Association of Western MA. 

I recently noticed on your website that BRPC is helping to assist the Briggsville Water District, which supplies drinking water to 10% of Clarksburg, MA, in identifying and developing grant applications to make necessary upgrades to the Red Springs water supply infrastructure.

Read More
0 Comments

    Categories

    All
    9/26/23 Petition Comments
    Boards Of Health
    Dept. Of Public Utilities
    Grants & Financial Assistance
    MA Dept. Of Enviro. Protection
    The Press
    Water Quality

    Archives

    November 2023
    September 2023
    August 2023

    RSS Feed

Housatonic Residents For Clean Water 

www.HousatonicCleanWater.COM  |  [email protected]

Copyright © 2023 Housatonic Residents for Clean Water
  • HOME
  • DOCUMENTS
    • Posters
    • Documents
    • Correspondence
    • Comments
    • Funding Options
    • Press Releases
    • The Plan
  • Resources
  • Events
  • About Us / Donate
  • CONTACT / Sign Up